Selection of completed projects
Silesian Center for Heart Diseases in Zabrze 2 Szpitalna St. Construction of medical-administration facility: outpatient clinic, lung & heart transplantology center, cardiovascular deficiency center, angiology center and administration wing serving needs of the Silesian Center for Heart Diseases in Zabrze (M. C. Sklodowska Street). Realization period: 16.08.2006 - 15.08.2008 |
Public Independent Clinical Hospital in Warsaw 1A Banacha St. Modernization of the building and operating block incl. 20 operating rooms and central sterilization unit. Due to continuous block operation requirements works have been divided into 4 stages:
|
„Monument – Children Healthcare Center” in Warsaw Operating rooms equipment In August 2000, Grupa 3J Sp. z o.o. equipped the operating rooms of the „Monument – Children Healthcare Center” in Warsaw in medical bridges facilitating operation of the medical personnel. It also equipped the hospital in a sanitary-epidemiological protection system with all indispensable devices. Once again, Grupa 3J had an opportunity of executing a project that led to safety and comfort of patients and medical personnel. |
Provincial Hospital in Bielsko-Biala End to end construction of an Operating Block
The rooms were fitted with: suspended ceilings and conducting & electrostatic flooring. Newly elevated building is fully equipped with medical gases and electric installation. GRUPA 3J became a synonym of highest quality in construction services for a very demanding healthcare market. Skilled engineers, top quality raw materials and its treatment are at the foundation of this quality. Remarkable quality of Grupa 3J services is backed by Hospital Director’s references.
|
Polish-American Heart Clinics and Invasive Cardiology Clinic in Ustronie Construction of 1st Invasive Cardiology Clinic Grupa 3J Sp. z o.o. constructed and thoroughly equipped the 1st Invasive Cardiology Clinic commissioned by American Heart of Poland Sp. z o.o. The facility is equipped with all devices and installations that doctors, supporting personnel and foremost – patients – can expect. Technical solutions and the highest standard of interior finish confirmed European service quality offered by GRUPA 3J. Professional design and comprehensive project allowed for maximum cost reduction for the investor, while offering a facility and equipment worthy of XXI century. Everything that stands today for modernity, high quality and providing patients with the right level of medical care and safety was reflected in this enterprise. |
Independent Public Central Clinical Hospital in Warsaw Modernization of Operating Block and Admitting Room Our company designed a systemic plan for capability & spatial expansion and modernization of the operating block consisting of 16 operating rooms with direct supporting area. The operating block was functionally connected to the post-operating unit and the ECU. Currently, we are executing the 1st stage that covers construction and equipment of the cardiologic operating rooms. Comprehensive modernization of the admitting room began in 2000 and included construction and installation work: air-conditioning, electric network and sanitary installations. The work was completed in November 2002. |
Specialized dr Psarski Hospital in Ostroleka Construction of operating block in building B Project began on 2nd October, 2001 and was completed on 9th August, 2002. Operating block of this hospital covers 1649 sq. m. Functional layout consists of 6 operating rooms, including:
Each of the above rooms includes patient & doctor preparation room as well as supporting rooms and corridors. Operating rooms and supporting rooms were fitted with sanitary-epidemiological protection system consisting of protective panels made from stainless steel and equipped with integrated automatic doors. Klimor devices were used in air conditioning installation (covering entire block and construction of laminar exhausts in operating rooms). Medical gases installation was fitted with Dräger equipment. Operating rooms carry carbon dioxide and argon on top of basic medical gases.
|
Western Hospital in Grodzisk Mazowiecki Construction of blocks: D, G1, G2, H Contract for construction of D, G1, G2, H blocks and ambulance driveway was signed in June 2000 between Grupa 3J Sp. z o.o. and Department of Health Care: Central Investment Board in Warsaw. The contract includes fully air-conditioned operating block consisting of 4 operating rooms, supporting rooms and integrated system of automated doors. According to design, operating block will be fitted with sanitary-epidemiological protection system made from stainless steel. The similar system will be used in 2 treatment rooms that will be placed in the admitting unit. Construction works are carried out according to timeline, and European standards. |
Military Clinical Hospital with SP ZOZ Policlinic in Wroclaw Expansion of the Cardiology Center Grupa 3J’s experience and specialized knowledge allowed us to come up with a functional & spatial concept and a reconstruction design of existing building layout to meet Cardiology Center’s needs. Newly designed Center will be localized in one Military Clinical Hospital wings and will contain 2 operating rooms and one treatment & operating room, intensive care unit as well as proper supporting and social rooms. Operating rooms will be fitted with sanitary-epidemiological protection system made from stainless steel. The entire facility will be fully air-conditioned, mechanical ventilation and will be fitted with all the modern internal installations. Quality of Grupa 3J work will enable comfortable conditions for hospitalization as well as safe and top-quality environment for the medical personnel. |